Total Station System (TSS) Survey Specification Highway Surveying Manual Page 9-3 January 2005 Total Station System (TSS) Survey Specification 9-04 Second Order . For 2-D stakeout, the number of the stake point is entered, the instrument will display differences of angles and distances to orient the prism. The line proceeded northeast to Pape Avenue and Danforth Avenue and continued north along Pape Avenue, making a northsouth crossing of the Don River to the Thorncliffe Park neighbourhood. Continuing west on an elevated structure, the line would curve south over Millwood Road across the Don Valley on a new bridge roughly parallel and west of Leaside Bridge. Wow! When you are satisfied with the results stake it and have the rodman write the cut or fill on the stake. Prism Pole, For Surveying, Total Station, Sokkia, Topkon, Trimble, Leica 2.6 meter; Leica charger GKL341 original for all battery; Archives. The total station is then mounted at the three-pin tribrach and internally leveled with either level vials or digital dual-axis methods, depending on the kind of the instrument. Total Station Dr. Maher A. El-Hallaq Lecturer of Surveying The Islamic University of Gaza Introduction. In the case of setting out, it makes it feasible to set control points for surveying with very little sighting through the telescope. MAGNET Field: Backsight Set Up using 2 known points with Total Station . This manual contains important safety directions (refer to section Safety directions) as well as instructions Rolling stock, systems, operations and maintenance, North Pape tunnel and underground stations, Last edited on 28 February 2023, at 15:10, Ontario Ministry of Environment, Conservation, and Parks, "Metrolinx's Ontario Line, Toronto, Canada", "The province breaks ground on Ontario Line subway", "Ontario premier says construction underway on new Toronto subway line", "Bechtel wins Delivery Partner role on Toronto Ontario Line", "Ontario Line costs nearly double after awarding of latest contracts", "Doug Ford commits $11.2B for 4 major GTA transit projects, including new 'Ontario Line', "Premier Ford Unveils Transportation Vision: Ontario Announces $28.5, "Future TTC Rapid Transit Map 2031 Projection", "TTC chief: Subway expansion for downtown relief line has to be discussed 'right now', "City proposes Queen Street route for Toronto's downtown relief line", "Mayor John Tory's transit priorities face financial, political challenge: analysis", "Longtime subway relief line fantasy lurches closer to reality", "The New "Ontario Line" Better, Faster, Smarter", "Chapter 1, Section B: Putting People First", "How Ford's Ontario Line plan came together in just three months with secrecy, a shifting route and a consultant", "Ontario budget reveals locations for downtown relief line subway stations", "Ontario Place advocates wary of Doug Ford's transit plan", "Doug Ford's transit plan has good elements. The station building design will feature heritage attributes by retaining the faade of buildings to be demolished for station construction. Now Move the Instrument until comes . Total station field techniques. The SET2 is a tacheometer, a device that can rapidly measure [47][48], The Ontario Line maintenance and storage facility (OLMSF) will occupy a 17.5-hectare (43-acre) site north of Overlea Boulevard, between Beth Nealson Drive and the CP Rail North Toronto Corridor. There are doubts that passengers can alight and board smaller Ontario Line trains quickly enough to achieve the projected 90-second train frequency. Once the area has been mapped out, you can use the total station to perform a task called a stake out. Conventional Method Slope staking using a total station and data collector, setting out the offset and distance from the design catches and then manually slope staking from this point. 3. There will be a substation at 153 Dufferin Street, opposite Dufferin Gate Loop. The less expensive unit with a single prism reflector can measure distances up to 1000 m. Those in the higher price range are capable of measuring distances up to 2000 m when single prisms are used. Then select the Model of your Total Station from the dropdown menu. Select the method that you want to use to stake out the point. For most programs, a retro-reflector prism is attached to the top of the. How To Stake Our Points Staking out points is one of the most common uses for a total station. for instantaneous determination of a total station location working on the site, by mounting the antenna directly on top of the total station alidade; thus eliminating the need for establishing permanent horizontal control stations. Refinements to existing technology are the classes of servo-driven and robotic optical total stations. [28], In October 2019, Tory and Ford reached a tentative deal in which the city would endorse the line and the TTC's subway network would not be taken over by the provincial government. 1. How to Stake Out with a Total Station - Career Trend These will be used to store trains and to provide for future northward expansion. Site clearance. Use the polyline to create points along that line (usually every 20-25m but depends on what you're laying out). Using a total station, you can easily capture important measurements for land surveying, construction and many other projects. Escalators, elevators and interior corridors will be available to facilitate transfers. At University Avenue, the Ontario Line will run under Queen Street and cross under Line 1 at the station. Product identification The type and serial number of your product are indicated on In the mid-2010s, the City of Toronto developed plans for this line, known as the "Relief Line South",[a] between Pape station on Line 2 BloorDanforth and Osgoode station on Line 1 YongeUniversity. Chris Waller began writing in 2004. When the stakeout is done, the station/offset dialog appears for staking the next point. Stake Points Screen . PLT 300 layout tool. Stake out using total station - gsk.cryptodemokrata.pl veklius, post: 335559, member: 10448 wrote: Hi, I was wondering if someone could help me with surface stakeout for trimble access. The station will service a future office development. Leica Total Station Ts13 Setup Known Backsight Leica Geosystems Ag CIVIL; Original Battery house for Leica TS/02/06/09 Total Station; 31. . One entrance will be on the east side of Carlaw Avenue north of Gerrard Street. 0. . Control points established by resection methods . We pride ourselves in being your one-stop shop throughout all the phases of your . The program + Measurement using CL or CL and CR (circle left & circle . [27] The City of Toronto's Relief Line proposal was expected to use existing heavy-rail rolling stock that is also used on Lines 1, 2, and 4. The total station observes the geometry of the GNSS antennas by measuring angles and distances to the 360 col-located reflectors (Active Control Points). We have also tried to give a little brief about the Total Station. Copyright 2016 Skyfi Education Labs Pvt. Civil Simplified is the leading education provider in the field of Civil Engineering in India delivering quality services through hands-on, practical, application-oriented workshops, trainings, projects and internships. It is useful for measuring horizontal angles, vertical angles, and distance it does this by analyzing the slope between itself and a specific point. How to pick the best Total Stations? - Quinn Equipment Construction How to use a total station steps are as follows. Record the horizontal and vertical angles using the viewing scope found on the theodolites side. Using the collimator (a crude sighting device) on the top of the total station instrument, align the total station with the prism. [57], East Harbour station will be built along the existing railway embankment. Method B: Using a Level or Total Station When? A normal rod level is utilized to interrogate the prism pole above a point. [71] The station building design will feature heritage attributes by retaining the faade of buildings to be demolished for station construction. When I import it to my TSC3 I do not have the option to import such files. Most use a three-screw, forced-centering Wild-type tribrach bracket to fasten and align the total station together with the tripod. Computers can be employed for map making and plotting contour and cross-sections. The station will have two additional entrances. Focus and plate management tangent and locking screws vary widely between total station brands. [32] On November 17, 2022, Metrolinx and Infrastructure Ontario awarded the contract to Connect 6ix, a consortium including Hitachi Rail, Webuild, Transdev, IBI Group, among others, with a projected in-service date of 2031.[33]. The following are some of the major advantages of using total station over the conventional surveying instruments : Field work is carried out very fast. Metrolinx would help relocate businesses within Thorncliffe Park. Input Point Id & Enter than input ENH. If the specified slab elevation is above or below the reference point, figure out by how much and determine where that point should be in relation to the level plane. The northeastern terminus of the Ontario Line would be Science Centre station at Don Mills Road and Eglinton Avenue. NSS Canada Completes Successful MOSS Implementation at Jaguar Mining Inc. in Brazil, High Tech Hardhat Being Developed in Sudbury Will Make Mining Safer CTV News. When these instruments are used manually, because they are servo-driven, they have friction clutches that afford great speed in point, as there are no locks to be adjusted. Press the Line option. The documents showed that the proposed route would be markedly different from that of the Relief Line South and involve significant lengths of at-grade or elevated track. All control points used for data gathering and stake out, including photo control, are adjusted by the method of least squares. Step 5: Continue to Level and Adjust the Tribrach As Necessary. This Apps helps Land Surveyors and Civil Engineers to measure and collect topography survey data by connecting users Android phone/tablet to a total station by using bluetooth or a usb-serial adapter cable. 4. Metrolinx said that the original completion date was based on market conditions that since 2019 had changed dramatically. Posted by : admin On : October 24, 2020. Trimble Trimble S Series Total Station User Guide vii Trimble S Series DR 300+ The Trimble S Series DR 300+ is a CLASS 2 LASER PRODUCT The instrument contains visible and invisible laser sources [52] The government also claims the alternate technology will reduce construction time and cost, as single tunnels rather than dual tunnels could be utilized. Place the total station in the spot from which you want to stake out points after you have finished entering the coordinates for the area into the total station's internal memory. A second entrance will be on the south side of Gerrard Street adjacent to Gerrard Carlaw Parkette. What are the uses of a total station in surveying? What is Setting Out/Stake out? Fig.1: Example plan to be set out on the ground. The section between Queen/Sherbourne and Gerrard stations would come to the surface and mostly follow a railway right-of-way instead of being tunnelled. [12][13] The Relief Line was included in the regional transportation plan The Big Move and was noted as one of Metrolinx's top 15 transit priorities.[14][15]. History of construction surveying. [ citation needed ] Profession [ edit ] [citation needed] As of January2023,[update] the proposal was not funded. This page was last edited on 28 February 2023, at 15:10. TcpET Surveying and Setting Out using Total Station Introduction This application, installed in a pocket PC, allows the user to survey and stake out topographical data using a wide range of total stations, connected through a standard cable or through wireless Bluetooth technology. A total station would set out using co-ordinates and Electromagnetic Distance Measurement (EDM) whilst the theodolite would find the bearing then the distance would be measured with a tape. In motorised stations, the software will automatically direct the device to the desired location. The GO Transit rail corridor will be on the east side of the Ontario Line tracks, but there will be no GO Transit railway station here. The station is at the western of the two intersections.) Enter the coordinates of the point. TcpET Surveying and Setting Out using Total Station Introduction This application, installed in a pocket PC, allows the user to survey and stake out topographical data using a wide range of total stations, connected through a standard cable or through wireless Bluetooth technology. [9] By the end of August 2022, buildings at the site of the future Corktown station had been demolished to allow for construction to start in 2023. Lets take a look at the steps involved to properly set up and level the Trimble Total Station. In December 2021, Metrolinx made a $49.5million agreement with the Islamic Society of Toronto to move to a larger facility at 20 Overlea Boulevard. To compute the coordinates of observed points, it is necessary to properly orient the instrument to some known directions such as true north, magnetic north or to some known bearing. . Electronic Total Station SOKKIA USA It is also used by archaeologists to record excavations as well as by police, crime scene investigators, private accident Reconstructionists and insurance companies to take measurements of scenes. The elevated Ontario Line station will have a centre platform and two entrances. ; In the sixth century BC geometric based techniques were used to . We help brands optimize their online presence & performance. Learn more. However, by 2012, the Toronto Transit Commission stated that a relief line will be required by the 2030s, given the overcrowding and high demand along the Yonge corridor. The line would continue westward to a QueenSpadina station, then diagonally southwest via a KingBathurst station to Strachan Avenue. [54], Cosburn station will be located at Cosburn Avenue and have a centre platform. This Apps has been optimized for 7in Tablet use. The tunnel will be under the land on the east side of Berkeley Street. This study aims to: (1) develop the concept of instructional media based on total station animation video which is used to measure building stake out; (2) developing interactive media designs; (3) due diligence of interactive media; and (4) dissemination of interactive media. Use this method when you want to quickly set out a large number of pegs and maintain accuracy over a large area. Step 3: Set-up the Tripod. You should be prompted for your stakeout job when opening the App. The line would then enter Gerrard station on an elevated structure over the intersection of Gerrard Street and Carlaw Avenue. . Also, read: What Is Transit Theodolite | Theodolite Parts. Then shoot the laser at the reflector with SEARCH by hitting the F1 key. Product identification The model and the serial Adjust the total station where necessary. Total Station Vertical and Horizontal field check NEI \The first number is thestationingthat is ending. [56], The station structure will be separate from the parallel railway bridge and embankment. Setting-Out Points Using the Total Station Interface in As-Built for AutoCAD Setting-Out Points Using the Total Station Interface in As-Built for AutoCAD Last updated Save as PDF Share Setting-out with As-Built Setting-out Points if Control Points are Available Setting-out Points if Control Points are Not Available Setting-out Axes (Batter Board) SURVEYING INSTRUMENTS SET300 SET300S SET500 SET500S SET600 SET600S Electronic Total Station Class 1 LED Product Class I LED Product OPERATORS MANUAL [22][51] By using driverless trains with automatic train control (ATC), Metrolinx expects the line to be as frequent as the existing heavy rail lines despite using smaller, lighter trains. Running slightly east of Pape Avenue, the Ontario Line will have a centre platform under Line 2 at the station. The Ontario Line was announced by the Government of Ontario on April 10, 2019. [69] The affected trees were planted during World War II. whenever the field jobs are finished, the map of this area with dimensions is ready after information transfer, Tremendous plotting and area computation in any user necessary scale, Integration of database (exporting the map to GIS packages), Full GIS creation (using Mapinfo software). SITENG - Setting Out #7 \"Stakeout\" In today's video I am showing how to use the Stakeout program using a Total Station. The Then select the Model of your Total Station from the dropdown menu. It is also a proposed station for SmartTrack service. TinySurveyor World's Fastest Robot for Stake Out Category: This movement from the construction plan to the actual site by transferring dimensions from the layout plan to the ground is called setting out. As of June2021[update], Metrolinx had not indicated the location of entrances and exits for this station. Contents 3 The Level 4 Preparing to Measure 5 Setting up the Level 5 Levelling-up the Instrument 5 Preparing the Instrument for Parallax-free Measurements 6 Total Stations for Surveying, Construction, and Mapping - EngineerSupply This item is in the category "Business & Industrial\Construction\Levels & Surveying Equipment\Total Stations & Accessories". 2 bedroom apartment for rent in surrey central, south carolina voter registration statistics, application of binomial distribution in civil engineering, Proportional Symbol Map Advantages And Disadvantages, Washington 4th Congressional District Candidates, hollywood heights full episodes dailymotion. Set up and use Total Station/EDM equipment for establishing control, detail surveying, setting out and coordinate checks. The line would pass through Thorncliffe Park station, which would be over the western portion of Thorncliffe Park Boulevard. An assortment of target poles is used for the remote rod to that topographic observations are created. How To Use A Total Station | Survey Equipment - EngineerSupply The measurements are typically recorded by hand as they are not recorded by a computer or data collector. Atotal stationis an opticalsurveying instrument that uses electronics to calculate angles and distances. Discussions with users at other engineers and surveyors, local survey suppliers, and AE survey builders are will also be recommended. The two city blocks bounded by Berkeley, King and Parliament Streets, and north of Parliament Square Park will be razed for tunnel launch shafts. Mining Solutions. Operating the Ontario Line along an elevated Lakeshore East embankment might require slower speeds in order to navigate grades and curves. 8.0. Contouring using Total Station 11. [10], .mw-parser-output .RMbox{box-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2)}.mw-parser-output .RMinline{float:none;width:100%;margin:0;border:none}.mw-parser-output table.routemap{padding:0;border:0;border-collapse:collapse;background:transparent;white-space:nowrap;line-height:1.2;margin:auto}.mw-parser-output table.routemap .RMcollapse{margin:0;border-collapse:collapse;vertical-align:middle}.mw-parser-output table.routemap .RMreplace{margin:0;border-collapse:collapse;vertical-align:middle;position:absolute;bottom:0}.mw-parser-output table.routemap .RMsi{display:inline;font-size:90%}.mw-parser-output table.routemap .RMl1{padding:0 3px;text-align:left}.mw-parser-output table.routemap .RMr1{padding:0 3px;text-align:right}.mw-parser-output table.routemap .RMl{text-align:right}.mw-parser-output table.routemap .RMr{text-align:left}.mw-parser-output table.routemap .RMl4{padding:0 3px 0 0;text-align:left}.mw-parser-output table.routemap .RMr4{padding:0 0 0 3px;text-align:right}.mw-parser-output table.routemap>tbody>tr{line-height:1}.mw-parser-output table.routemap>tbody>tr>td,.mw-parser-output table.RMcollapse>tbody>tr>td,.mw-parser-output table.RMreplace>tbody>tr>td{padding:0;width:auto;vertical-align:middle;text-align:center}.mw-parser-output .RMir>div{display:inline-block;vertical-align:middle;padding:0;height:20px;min-height:20px}.mw-parser-output .RMir img{height:initial!important;max-width:initial!important}.mw-parser-output .RMir .RMov{position:relative}.mw-parser-output .RMir .RMov .RMic,.mw-parser-output .RMir .RMov .RMtx{position:absolute;left:0;top:0;padding:0}.mw-parser-output .RMir .RMtx{line-height:20px;height:20px;min-height:20px;vertical-align:middle;text-align:center}.mw-parser-output .RMir .RMsp{height:20px;min-height:20px}.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>div{line-height:.975;display:inline-block;vertical-align:middle}.mw-parser-output .RMir .RMts{font-size:90%;transform:scaleX(.89)}.mw-parser-output .RMir .RMf_{height:5px;min-height:5px;width:20px;min-width:20px}.mw-parser-output .RMir .RMfm{height:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto}.mw-parser-output .RMir .RMo{width:2.5px;min-width:2.5px}.mw-parser-output .RMir .RMc{width:5px;min-width:5px}.mw-parser-output .RMir .RMoc{width:7.5px;min-width:7.5px}.mw-parser-output .RMir .RMd{width:10px;min-width:10px}.mw-parser-output .RMir .RMod{width:12.5px;min-width:12.5px}.mw-parser-output .RMir .RMcd{width:15px;min-width:15px}.mw-parser-output .RMir .RMocd{width:17.5px;min-width:17.5px}.mw-parser-output .RMir .RM_{width:20px;min-width:20px}.mw-parser-output .RMir .RM_o{width:22.5px;min-width:22.5px}.mw-parser-output .RMir .RM_c{width:25px;min-width:25px}.mw-parser-output .RMir .RM_oc{width:27.5px;min-width:27.5px}.mw-parser-output .RMir .RM_d{width:30px;min-width:30px}.mw-parser-output .RMir .RM_od{width:32.5px;min-width:32.5px}.mw-parser-output .RMir .RM_cd{width:35px;min-width:35px}.mw-parser-output .RMir .RM_ocd{width:37.5px;min-width:37.5px}.mw-parser-output .RMir .RMb{width:40px;min-width:40px}.mw-parser-output .RMir .RMcb{width:45px;min-width:45px}.mw-parser-output .RMir .RMdb{width:50px;min-width:50px}.mw-parser-output .RMir .RMcdb{width:55px;min-width:55px}.mw-parser-output .RMir .RM_b{width:60px;min-width:60px}.mw-parser-output .RMir .RM_cb{width:65px;min-width:65px}.mw-parser-output .RMir .RM_db{width:70px;min-width:70px}.mw-parser-output .RMir .RM_cdb{width:75px;min-width:75px}.mw-parser-output .RMir .RMs{width:80px;min-width:80px}.mw-parser-output .RMir .RMds{width:90px;min-width:90px}.mw-parser-output .RMir .RM_s{width:100px;min-width:100px}.mw-parser-output .RMir .RM_ds{width:110px;min-width:110px}.mw-parser-output .RMir .RMbs{width:120px;min-width:120px}.mw-parser-output .RMir .RMdbs{width:130px;min-width:130px}.mw-parser-output .RMir .RM_bs{width:140px;min-width:140px}.mw-parser-output .RMir .RM_dbs{width:150px;min-width:150px}.mw-parser-output .RMir .RMw{width:160px;min-width:160px}.mw-parser-output .RMir .RM_w{width:180px;min-width:180px}.mw-parser-output .RMir .RMbw{width:200px;min-width:200px}.mw-parser-output .RMir .RM_bw{width:220px;min-width:220px}.mw-parser-output .RMir .RMsw{width:240px;min-width:240px}.mw-parser-output .RMir .RM_sw{width:260px;min-width:260px}.mw-parser-output .RMir .RMbsw{width:280px;min-width:280px}.mw-parser-output .RMir .RM_bsw{width:300px;min-width:300px}, Plans for an eastwest downtown subway line date back to the early 20th century, most of which ran along Queen Street. A traditional plumb bob provides this type of check if utilized in ideal conditions. A total station would set out using co-ordinates and Electromagnetic Distance Measurement (EDM) whilst the theodolite would find the bearing then the distance would be measured with a tape. The Ontario Line station will have centre platforms and two entrances. stake out using total station. All the equipment used Select . Please read this operators manual carefully, before using this product. Metrolinx expects the Ontario Line connection at Pape station will reduce rush-hour congestion at BloorYonge station by 22 percent. Otherwise, then the retro-reflector offset correction has to be determined and implemented to found spaces. Mechanical and electrical construction Total stations have become the highest standard for most forms of construction layout. It's a step by step guide in which you will see how to mark a point using stakeout program on your EDM. The trees were about 70 years old. [ citation needed ] Profession [ edit ] If not you will need to return to the main menu and select the Tap Here to choose Design Data to the far left of the job carousel. Servo-driven instruments are particularly appealing where automatic pointing is desired. [5], A ground-breaking ceremony attended by Ford, Tory, and other politicians and officials was held on March 27, 2022 at Exhibition Place, despite no major contracts having been awarded at that point. All control points used for data gathering and stake out, including photo control, are adjusted by the method of least squares. The main pieces ofsurveying equipmentinusearound the world are the following: theodolite, measuring tape, total station, 3D scanners, GPS/GNSS, level and rod. Angle-distance method to stake out the horizontal alignment by total station, Assuming that the total station with reflector is the tool that it is intended to lay out the circular curve after being designed then the only way to do so is to construct a table that contains angle-distance values. Turn the total station until the horizontal circle reads . [54], Flemingdon Park station will be located on the west side of Don Mills Road at the north side of its intersection with Gateway Boulevard. STN for station points, CB for corner #4 of the top-rated hostels near Union Station, Toronto. Each maker may have varied models, together with optional features which may be tailored to local working conditions, such as accuracy requirements, project size (EDM distances), and also accessible crew size. Setting up the Total Station The Total Station needs to be levelled and set up over the point P1 (which I am going to call A, I am using A because I did not know that in the Total Its southern terminus will be at the existing Exhibition GO Station on the Lakeshore West line. Angle-distance method to stake out the horizontal alignment by total station , Assuming that the total station with reflector is the tool that it is intended to lay out the circular curve after being designed then the only way to do so is to construct a table that contains angle-distance values. Various techniques and instruments are used for this process of setting out. Toronto Union Train Station | Map & Adress - CANADA TRAINS Every construction project relies on accurate measurements and the Total Station is one of the most important pieces of surveying equipment used in the industry today. Contents Standard measurements. Conventional Method Slope staking using a total station and data collector, setting out the offset and distance from the design catches and then manually slope staking from this point. [45], South from Pape station, the line would travel roughly under Pape Avenue, emerging to the surface just north of Gerrard Street. Follow the LinkedIn page LinkedIn: https://www.linkedin.com/company/sitenghttps://www.linkedin.com/in/greg-stepien-7346ab183Subscribe: https://www.youtube.com/c/SITENG?sub_confirmation=1 EVERY GOOD CIVIL SITE ENGINEER MUST HAVE - watch the VID https://youtu.be/4X-nwn-J-wo - items I use and recommend SAFETY BOOTS-choose your size https://amzn.to/3NfjUCJ https://www.screwfix.com/p/dewalt-phoenix-safety-boots-tan-size-9/7001vTAPE MEASURE https://amzn.to/3xQ3cEf https://amzn.to/3xZ9ykMTAPE HOLDER https://amzn.to/3NzLDOV https://ffx.co.uk/product/Get/Makita-E-05278-088381566780-Tape-Measure-Holder CALCULATOR - sometimes you can find them half price in Supermarkets https://amzn.to/3u2hHE6DRAWING FOLDER https://amzn.to/3NqYoeA https://amzn.to/39OUNZP NOTEBOOK - get whatever really to take some notes https://amzn.to/3HQkbLxPENCIL - 0.7mm - good price, but for this colour https://amzn.to/3OlvwW3PENCIL - 2mm https://amzn.to/3QHVIffJOINER'S PENCIL https://amzn.to/3xRIaFlTIPP-EX - these are the best I used https://amzn.to/3QNrKGHPERMANENT MARKERS https://amzn.to/3ykpcZvCHALK LINE https://amzn.to/3A0aUOYFEW EXTRAS I USE TOO SMALL SPIRIT LEVEL - you can always borrow from a Chippie if needed https://amzn.to/3OEXs79KNIFE https://amzn.to/3HQKUrl GLASSES - Despite you will get safety glasses, on some sites theyre really low quality and I dont want to get my sight worse using them. Total Station and Automatic Level; however may over look the importance of the tripod, prisms and staffs employed in accurately measuring and setting out. A total station is an electronic/optical instrument used in modern surveying. In motorised stations, the software will automatically direct the device to the desired location. In August 2018, an alignment was approved by the Ontario Ministry of Environment, Conservation, and Parks. A set of plugs can be used to locate the total station set up in a drift or tunnel by processing measurements to the plugs by intersection and resection. TcpET Surveying and Setting Out using Total Station Introduction This application, installed in a pocket PC, allows the user to survey and stake out topographical data using a wide range of total stations, connected through a standard cable or through wireless Bluetooth technology. Either enter the next station/offset or pick Exit to end Template Stakeout. Select "HD" to stake out using angle and distance, or "XYZ" to stake out with 3D coordinates.